Oc t 3-6        loco_animation_thumb.gif (3004 bytes)

On Weekend Five, the BOMB squad nailed on the deck planking and built one side rail on the Saturday. The Forestry Museum and Weyerhaeuser volunteers built the other rail, backfilled to the south end of the bridge, built the bridge extensions and trimmed rough edges from the bridge on Sunday.

BOMB Squad install the deck

Side rails and the extensions

Weyerhaeuser volunteers on the famous complex angle

Moe Kaufmann planes away the uneven edges


Back Up Next

Or, Go to Homepage or to another Theme: What's NEW  Photo Gallery About Us Miniature Railway  Logging  Railways   Willingdon Beach Trail   Museum Tour   Research  Web-links   Credits and References