Sep 12-14        loco_animation_thumb.gif (3004 bytes)

On the second weekend, the pilings were cut to height and the H beams tacked in place. (click for larger photo; return with back button)

Tom cuts off the pilings. Tom Sparks.

Lots of grinding

I-Beam tacked in place

All four ready for final weld

Back Up Next

Or, Go to Homepage or to another Theme: What's NEW  Photo Gallery About Us Miniature Railway  Logging  Railways   Willingdon Beach Trail   Museum Tour   Research  Web-links   Credits and References