By-pass Trail        loco_animation_thumb.gif (3004 bytes)

Construction would block the trail for six weeks, so an alternate route was required. During August, the BOMB Squad (Bloody Old Men's Brigade) constructed the by-pass, which will remain as a permanent access to Second Beach.

Back Up Next

 

 

Or, Go to Homepage or to another Theme: What's NEW  Photo Gallery About Us Miniature Railway  Logging  Railways   Willingdon Beach Trail   Museum Tour   Research  Web-links   Credits and References