On Sep 3, Dan, Dave, Al, Jerry, George, Barry, and Cameron levelled the site, cleared brush and added 50% of the gravel. On Sep7, Phil, Mike, Hans, Dan and Dave added another half truck load of gravel to widen the track and improve the grade.